We needed our office repainted without creating a major disruption for employees. Long Beach Expert Painting handled the project efficiently and gave the entire workspace a brighter, more professional appearance.
Commercial Painting Contractors in Long Beach, CA
Long Beach Expert Painting is Los Angeles County's trusted expert in commercial painting, working with property managers, general contractors and facility managers on apartment community repaints, commercial building exteriors, and industrial protective coatings. We handle projects from a 12-unit turnover package to 400-unit multifamily exterior programs and warehouse interiors above 200,000 square feet.
Our crews work occupied apartment communities, multi-tenant office buildings and operating retail centres, phasing building by building around residents and business hours so units stay rentable and doors stay open. Fully licensed, insured and bonded, with COI, W-9 and references available on request.
From field takeoff and submittal review through mock-up approval, phasing plan and punch walk, our team handles the parts of a commercial job that decide whether it finishes on schedule. Serving Long Beach and the surrounding Los Angeles County market, we hold the GC's schedule, work nights and weekends where the property requires it, and turn the work over ready for punch and inspection.
Request a FREE Quote!
Or call (562) 269-1108. Calls only, we do not receive text messages.
Thank you. Your request is in. We reply the same business day, and you can always call (562) 269-1108.
- Bid from drawings and field takeoff
- Phasing agreed in writing before mobilisation
- Prevailing wage and certified payroll
- Licensed, insured and bonded
Reviews
What Customers Say About Our Commercial Painting Contractors Work
Our commercial storefront needed an update, and Long Beach Expert Painting delivered exactly what we wanted. The new color scheme looks clean and professional, giving the building a much stronger street presence.
Long Beach Expert Painting repaired several damaged areas of drywall before repainting our bedroom. The repaired sections blend perfectly with the surrounding walls, and the finished room looks clean and polished.
The exterior paint had faded badly from years of sun exposure. After the project was completed, our home had stronger curb appeal and a fresh, updated appearance. The trim work looks especially sharp.
Our bathroom painting project came out beautifully. Clean edges and a flawless finish!
The painters took great care around our furniture, flooring, and fixtures. Our walls and ceilings look fantastic, and there were no drips or messy edges left behind.
Our new accent wall looks perfect. It completely changed the feel of the room.
Long Beach Expert Painting helped us choose colors that complemented our flooring and natural lighting. The finished interior feels warm, coordinated, and much more inviting. We are extremely happy with the transformation.
01
Scope, project size and who this is for
Property managers running apartment inventory in Alamitos Beach, Downtown, North Long Beach and West Long Beach. HOA and condo boards working from a reserve study and a scheduled paint cycle. General contractors carrying painting as a subcontract line. Facility managers at industrial and logistics buildings along the I-710 corridor and Santa Fe Avenue.
| Project type | Typical scope indicators | How it is bid |
|---|---|---|
| Apartment and multifamily repaint | 50 to 400 units, 2 to 4 stories, exteriors plus common areas | Field takeoff by elevation and building |
| HOA and condo association contract | Board-approved scheme, phased by building, reserve-funded | Takeoff plus phasing plan for board approval |
| Apartment turnover program | Per-unit repaint between tenants | Unit prices by unit type, standing annual schedule |
| Commercial exterior repaint | Single building to a multi-building campus | Elevation takeoff, staging and access priced separately |
| Commercial interior | Corridors, common areas, back of house, full floors | Area takeoff, off-hours shift premiums stated |
| Office and tenant improvement | 5,000 to 60,000 sq ft, floor by floor | Takeoff from drawings and finish schedule |
| Retail and shopping centre | Storefronts, common corridors, exterior facades | Per-tenant scope, night and weekend sequencing |
| Warehouse and industrial | Deck, structure, walls, above 200,000 sq ft possible | Area and structure takeoff, containment scoped |
| Industrial and protective coatings | Steel, tanks, structural members, containment required | Surface area by member, system by exposure |
| Commercial epoxy and polyaspartic floors | Grind, moisture test, broadcast, topcoat | Area takeoff after moisture vapour testing |
| Parking garage and traffic deck coating | Multi-level, traffic-bearing membrane, striping | Deck area by level, phased to keep the structure open |
| School and municipal bid work | Public bid, prevailing wage, summer window | Per bid documents, certified payroll included |
| Property management maintenance contract | Standing account, multiple properties, annual scope | Annual scope with unit rates for call-offs |
Hotel, medical, restaurant, striping, fireproofing, builder-package and powder coating scopes are quoted the same way, from a takeoff. Property types we hold crews for: garden and mid-rise apartment communities, condominium associations, office buildings, shopping centres, medical suites, schools and municipal facilities, hotels, warehouses, manufacturing floors, parking structures and structural steel.
02
The commercial process
Nine stages. The ones that decide whether a job finishes on schedule are the four that happen before anybody opens a pail.
Site walk
Documented with the manager, GC or engineer: coating condition, failures, moisture and adhesion readings where the substrate is in question, elevation photos.
Field takeoff
Measured quantities by elevation, floor and unit type. On plan work we take off from drawings and note discrepancies before bid, not after award.
Written bid
Line-itemed by scope area: preparation, product, coats, exclusions, allowances, unit prices for adds. Alternates priced separately so the owner can cut scope without rebidding.
Submittals
Product data, SDS, colour submittals, warranty terms and the phasing plan, with mock-ups on request before production.
Preconstruction
Crew loading, sequence, working hours, tenant notification, staging areas, coordination with the GC's schedule.
Phasing plan
Building by building, wing by wing, floor by floor or unit block by unit block, agreed in writing before mobilisation.
Execution
Daily manpower reporting, containment where required, a foreman on site who owns the schedule.
Punch list
Walked with your representative and cleared by phase rather than stacked to the end.
Closeout
Warranty letter, final unconditional lien releases, colour and product schedule by area, attic stock quantities, photo documentation.
03
Working in occupied buildings
Most of the work we do is on properties that never close. That is a scheduling problem before it is a painting problem.
Apartment communities
We phase by building and post resident notices with dates and access requirements, keeping entries and parking usable outside the active work zone. Turnovers are scheduled against the leasing calendar so a unit is coated, dried and inspected inside its vacancy window.
Offices and retail
We work nights, early mornings and weekends. Low-odour and low-VOC systems go into any space occupied within hours of coating, standard in medical suites and in schools working a summer window. Egress stays open, wet areas stay barricaded and signed, and equipment leaves the floor before the space reopens.
Industrial and port-adjacent work
Containment, ventilation and hot-work coordination happen with the facility's safety group before mobilisation rather than on the first morning.
Credentials and compliance
Fully licensed, insured and bonded, with additional insured status and waiver of subrogation issued where the contract requires it, and bid, performance and payment bonds on qualifying work. Workers compensation in force, certificates issued directly to the requesting party. We are set up for prevailing wage and certified payroll on public work, including school district and municipal contracts. Lead-safe practices apply to any building predating 1978, which covers a large share of the older apartment inventory in Long Beach. VOC limits govern product selection statewide, and we specify to those limits and to Green Seal GS-11 where a low-emitting product is required.

04
Materials and systems at commercial scale
Substrate drives the system, and sheen follows traffic.
Interiors and metal
Acrylic latex over primed drywall and stucco in occupied interiors, because it is water-borne, cures by coalescence and re-coats fast. Alkyd and oil where a hard, chemically cured film is needed on metal doors, frames and railings. Semi-gloss on corridors, stairwells and production areas because it washes, satin in units and offices, flat on irregular high ceilings.
Exteriors
Cement stucco exteriors take crack routing and patching, then elastomeric or high-build acrylic depending on movement. Portland cement stucco is brittle and separates from an unstable base, so movement joints are part of the coating scope. Older masonry gets breathable mineral or silicate systems instead, because a film-forming coating over a permeable wall traps vapour and blisters.
Floors and steel
Epoxy is ground or shot blasted to a mechanical profile and moisture vapour tested before any resin goes down. Epoxy chalks out under UV and yellows by oxidation, so exposed installations carry a polyaspartic or urethane topcoat. Cure is exothermic and degrades if a batch is mixed too large, so ratios and batch sizes are logged.
Scheduling, lead time and capacity
Typical lead time from award to mobilisation is two to four weeks on projects of standard size, longer where custom colour matching, long-lead coatings or bonding are involved. Crews are sized to the phase, not the total contract: a 200-unit exterior program runs a different manpower curve than a 40,000 square foot warehouse floor done across two weekends.
Weather rarely stops exterior production here. Annual rainfall is 12.02 inches and the annual average temperature is 64.9 degrees, August at 74.3 and December at 56.7. The real constraint is the morning marine layer, which holds surface moisture on elevations well past sunrise and pushes coating windows later into the day.
05
Local commercial work in Long Beach
The city's commercial inventory splits into four markets, and each one has its own coating environment and its own working hours.
Port and industrial
The Port of Long Beach is the second busiest container port in the United States. The terminal, logistics and yard buildings serving it, including the Intermodal Container Transfer Facility on the western edge of West Long Beach, sit in the heaviest coating environment in the city. Salt off San Pedro Bay plus constant equipment traffic is what protective coatings exist for.
West Long Beach industrial along Santa Fe Avenue and the I-710 corridor runs warehouse, distribution and light manufacturing stock in ZIP 90810.
Office, retail and institutional
Downtown Long Beach carries the multi-tenant office inventory with the Pine Avenue retail corridor beside it, the 2nd Street corridor and Belmont Shore retail run facade work outside business hours, and the Long Beach Airport business area adds office and flex buildings.
Institutional work sits with California State University Long Beach and Long Beach Unified School District facilities, both on academic calendars and public bid procedures. The apartment inventory in Alamitos Beach, Downtown, North Long Beach and West Long Beach carries the recurring turnover and exterior cycle volume.

06
Frequently asked questions about commercial painting
Can you price a commercial contract from drawings alone?
Yes. We take off from drawings and specifications, review the finish schedule and coating spec, and submit written RFIs on discrepancies before the bid date, not as change orders after award.
What insurance and bonding do you carry?
We are fully licensed, insured and bonded. Certificates name the owner, manager or GC as additional insured, with waiver of subrogation and primary and non-contributory wording where the contract requires it, and workers compensation certificates come on the same request. Bid, performance and payment bonds are available on qualifying projects and carried as a separate bid line.
Do you handle prevailing wage and public work?
Yes. Certified payroll and prevailing wage on school district and municipal contracts, registered and reported as those contracts require.
What is your lead time from award to start?
Two to four weeks on projects of standard size. Custom colour matching, long-lead coatings and bond issuance can extend it, and the driving item is named in the bid.
How do you phase an occupied property, and can you work nights and weekends?
Phasing runs by building, wing, floor or unit block, agreed in writing before mobilisation, with tenant notification, protected egress and work zones barricaded and signed. Only the phase in production is disrupted. Night, early-morning and weekend shifts are standard on occupied retail, office and medical work, with premiums stated in the bid.
How does per-unit pricing work on turnovers?
Turnovers are bid as unit prices by unit type and scope, on a standing annual schedule. Damage beyond normal wear is a separate line so it does not distort the base unit rate.
What warranty and closeout documents do you provide?
A written workmanship warranty, manufacturer warranty documentation where applicable, final unconditional lien releases, a colour and product schedule by area, attic stock quantities, and phase photos.
Who supervises, and do you self-perform?
A foreman is on site for each phase and owns the schedule, daily manpower reporting and the punch walk, with a project manager handling submittals, change orders and billing. Preparation and application are self-performed. Scaffolding, high-access rigging and abatement are licensed subcontractors, identified in the bid.
What are your payment terms?
Monthly progress billing against a schedule of values, with retention per the contract and conditional releases issued with each application. Terms are stated in the bid and confirmed at award.
Can you hold a standing maintenance account across several properties?
Yes. That is how smaller recurring scopes are best handled, with an annual scope, agreed unit rates and a single point of contact for call-offs.
07
Commercial services
Six commercial scopes, each with its own crews, sequencing and submittal package.
- Apartment Complex Painting
- Apartment Turnover Painting
- HOA & Condo Association Painting
- Commercial Building Exterior Painting
- Office & Retail Interior Painting
- Industrial & Protective Coatings
- All painting services in Long Beach, CA
Painting service areas
Commercial crews work Long Beach and the surrounding Gateway Cities and north Orange County markets.
Request a bid
Send drawings, a specification, a unit mix or a walk request. We will schedule the site walk, complete the takeoff, and return a written bid with preparation scope, product schedule, phasing plan and exclusions stated in full.
- Written bid from a field takeoff
- COI, W-9 and references on request
- Licensed, insured and bonded
Request a FREE Quote!
Or call (562) 269-1108. Calls only, we do not receive text messages.
Thank you. Your request is in. We reply the same business day, and you can always call (562) 269-1108.
